All 50 states covered Sizing from published state code Free quotes, no obligation
Septic System
Cost Calculator
Home / Calculators / Pump schedule

Calculator

Pump-out schedule calculator

Solids build at a rate set by the household, not the tank. Pumping is due once they reach about a third of capacity.

Pump-out schedule calculatorService interval

On the permit, or stamped on the tank lid.

Compare local installers

Send these numbers to licensed contractors near you and get quotes for a pump-out and inspection. Free, and no obligation to hire.

Your details go to installers serving your ZIP code, and to no one else.

Typical intervals

Tank2 people4 people6 people
750 gal4.0 yrs2.0 yrs1.3 yrs
1,000 gal5.3 yrs2.7 yrs1.8 yrs
1,250 gal6.7 yrs3.3 yrs2.2 yrs
1,500 gal8.0 yrs4.0 yrs2.7 yrs
2,000 gal10.7 yrs5.3 yrs3.6 yrs

Subtract roughly a third from these if a garbage disposal runs daily.

Why the interval is not optional

Pumping costs a few hundred dollars. What it protects is the drainfield, which costs thousands to replace and cannot be unclogged once solids have sealed the soil surface. Everything else in septic maintenance is secondary to this one habit.

Full maintenance guide →